News
CAPACITY TEST:

Nvidia-SK AI Deal Carries $500 Billion Value With Few Build Details

Newsroom brief

Tom's Hardware reported that Nvidia and SK Group signed letters of intent for a strategic relationship valued at more than $500 billion, anchored by SK Telecom's planned 2-gigawatt South Korea AI data centre and a long-term SK hynix memory supply agreement.

Verified against source materialEdited by SendTech Times Chips & Compute DeskSource: Tom's Hardware
Nvidia-SK AI Deal Carries $500 Billion Value With Few Build Details
Image source: Tom's Hardware

A planned South Korea AI factory is carrying a much larger commercial number than its public build sheet.

Tom's Hardware put Nvidia and SK Group's letters of intent at more than $500 billion, while the disclosed infrastructure anchor is SK Telecom's planned 2-gigawatt AI data centre.

The deal combines three layers: a long-term memory supply agreement with SK hynix, a South Korea facility based on Nvidia hardware and future AI infrastructure expansions.

SK Group's announcement gives 2027 as the first service target and names Nvidia's DSX AI factory platform, Vera Rubin accelerated computing systems and SK hynix HBM4 memory for the installation.

SK Telecom Plans A 2-Gigawatt AI Factory

SK Group's announcement puts the planned South Korea facility at 2 gigawatts and identifies SK Telecom as the operator.

SK Telecom is positioning the buildout for sovereign AI, enterprise AI, physical AI and agentic AI workloads in South Korea and across Asia-Pacific.

The deployment path is still broad rather than contractual.

The public details identify Nvidia's DSX platform, Vera Rubin systems and SK hynix HBM4 memory, but they do not name site location, power provider, construction budget, customer contracts or rack count.

Nvidia's DSX definition combines accelerated computing hardware, networking, software and partner technologies into a data-centre-scale platform.

The planned facility therefore depends on a wider supply chain covering GPUs, networking equipment, systems, memory, cooling, storage and power infrastructure.

SK Hynix Memory Supply Anchors The AI Infrastructure Package

The memory component is central because SK hynix supplies high-bandwidth memory used with advanced AI accelerators.

The new letters of intent follow a June multi-year memory co-development and supply agreement between Nvidia and SK hynix.

The commercial value is not presented as one construction contract.

Anton Shilov interpreted the more than $500 billion figure as aggregate commercial activity over several years, bundling AI infrastructure construction with the long-term memory supply agreement.

Execution detail still determines how the value is allocated.

SK Telecom's purchases of Nvidia GPUs, networking equipment and systems, SK hynix memory supply to Nvidia, partner revenue from DSX AI factory construction and later infrastructure expansion may all contribute to the total, but the public record does not split the value by counterparty or year.

Rack Counts Remain Outside The Public Record

The facility's power envelope points to large infrastructure scale, yet the exact hardware count remains unavailable.

Shilov gave a rough scenario in which a 2-gigawatt AI data centre would use thousands of NVL72 VR200 racks and hundreds; the source also described of thousands of Vera CPUs and Rubin AI GPUs, while warning that the announcement was too vague for an accurate estimate.

Shilov gave NVL72 VR200 rack power ratings of 166 kW to 240 kW and added that DSX deployments can sit in facilities with different power usage effectiveness.

Without the selected rack configuration and facility PUE, the 2-gigawatt figure cannot be translated into a reliable accelerator count.

For Nvidia, SK Telecom and SK hynix, the disclosed plan connects memory supply, AI-factory hardware and a national-scale data-centre project.

The project still lacks the site and configuration evidence needed to link the stated value to named customers or yearly spending.

Share this article
inXf

Related articles

More
AMD AI Forecast Tests Investor Trust In Helios Demand
Chips & Semiconductors

AMD AI Forecast Tests Investor Trust In Helios Demand

AMD told investors that data centre revenue should more than double in 2027 as Helios and MI450 deployments expand, but its shares fell after the results as AI demand concentration remained a concern.

US Export-Control Shift Opens UAE AI Chip Access, DCD Reports
Chips & Semiconductors

US Export-Control Shift Opens UAE AI Chip Access, DCD Reports

Data Center Dynamics reported that the US government has moved the UAE into a lower-restriction export-control category, giving UAE companies broader access to advanced AI chips from Nvidia and AMD. The account names G42 and hyperscaler data-centre projects, but it does not list chip volumes, approved licences or specific UAE projects.

Gulf AI Plans Still Depend On Nvidia Chips Despite Supplier Push
Chips & Semiconductors

Gulf AI Plans Still Depend On Nvidia Chips Despite Supplier Push

Rest of World reported that Saudi Arabia and the UAE are trying to diversify AI chip supply while major projects still rely on Nvidia hardware. The report cited Humain data-centre plans, G42’s Stargate project and analyst warnings that U.S. approvals, TSMC capacity and high-bandwidth memory remain constraints.

Sandisk And SK Hynix Open HBF Spec For AI Memory Capacity
Chips & Semiconductors

Sandisk And SK Hynix Open HBF Spec For AI Memory Capacity

Tom’s Hardware put Sandisk and SK hynix’s OCP High Bandwidth Flash specification at up to 512GB per package, with bandwidth grades reaching 3.0 TB/s for AI inference systems.

Kospi-Nasdaq Correlation Hits 2021 High As AI Memory Trade Tightens
Chips & Semiconductors

Kospi-Nasdaq Correlation Hits 2021 High As AI Memory Trade Tightens

CNBC reported that Rayliant data put the 60-day Kospi-Nasdaq 100 relationship at its highest level since 2021, linking Samsung and SK Hynix more tightly to the U.S. AI hardware trade.

Nvidia Backstop Talks Add Credit Risk To OpenAI’s 10-Gigawatt Ohio Campus
Cloud & Data Centers

Nvidia Backstop Talks Add Credit Risk To OpenAI’s 10-Gigawatt Ohio Campus

CNBC confirmed talks over a Nvidia credit backstop of up to $250 billion for OpenAI’s planned 10-gigawatt Ohio AI data centre campus, with lease and construction debt separate from chip purchases.

Nokia And NVIDIA Push AI-RAN Roadmap Toward 2027 Field Tests
Chips & Semiconductors

Nokia And NVIDIA Push AI-RAN Roadmap Toward 2027 Field Tests

Nokia announced an AI-native RAN platform with NVIDIA Aerial integration and claimed demonstrated spectral-efficiency gains of more than 20%, while its larger 50% and 100% capacity targets remain tied to 2027 and 2028 roadmap milestones.

Quantum Data Centre Push Shifts From Qubit Counts To Hybrid Workloads
Cloud & Data Centers

Quantum Data Centre Push Shifts From Qubit Counts To Hybrid Workloads

Data Center Knowledge reported that quantum computing work is shifting toward hybrid systems that connect QPUs with GPU and CPU infrastructure. Hyperion estimated the market at $1.4 billion in 2025 and projected about $3 billion by 2028, while the article did not identify production customers, signed deployment contracts or facility-level power loads.

Keep Reading

More Stories

Latest
Hugging Face Hack Pushes AI Agents Into Cybersecurity SpotlightAIAug 8, 2026Hugging Face Hack Pushes AI Agents Into Cybersecurity SpotlightCNBC reported that Black Hat cybersecurity leaders treated the Hugging Face AI-agent breach as a turning point for governing autonomous cyber models rather than a one-off failure.Alibaba Tests Revenue Sharing For Commercial Qwen AI UseAIAug 8, 2026Alibaba Tests Revenue Sharing For Commercial Qwen AI UseAI News reported that Alibaba plans revenue-sharing terms for some commercial users of its next Qwen open-weight AI model, following a licensing pattern already used by Moonshot for Kimi K3.Meta Ordered To Fund $567M New Mexico Youth Mental Health PlanCapital & PolicyAug 8, 2026Meta Ordered To Fund $567M New Mexico Youth Mental Health PlanArs Technica reported that a New Mexico judge ordered Meta to provide $567 million for treatment, screening, awareness and prevention after finding that its platforms contributed to a public nuisance.Harvey Funding Talks Could Lift Legal AI Startup To $15.5B ValuationAIAug 8, 2026Harvey Funding Talks Could Lift Legal AI Startup To $15.5B ValuationSiliconANGLE reported that Harvey AI is seeking at least $500 million in new funding that could value the legal AI startup at $15.5 billion after annualized revenue passed $350 million.Vietnam Shows Shopee-TikTok Shop Race Tightening In Southeast AsiaScience & TechAug 7, 2026Vietnam Shows Shopee-TikTok Shop Race Tightening In Southeast AsiaTech Collective SEA wrote that Shopee’s Vietnam share fell from 61% to 53% between May 2025 and April 2026 as TikTok Shop rose from 33% to 44%, showing how social commerce is reshaping regional ecommerce infrastructure.China Opens Security Review Of Palo Alto Networks ProductsCybersecurityAug 7, 2026China Opens Security Review Of Palo Alto Networks ProductsChina's cyberspace regulator opened a security review of Palo Alto Networks products, with no named product line, technical flaw or decision timetable disclosed.AI Pioneers Split Over Risk As Compute Buildout AcceleratesAIAug 7, 2026AI Pioneers Split Over Risk As Compute Buildout AcceleratesData Center Knowledge reported that Geoffrey Hinton, Fei-Fei Li and Andrew Ng disagreed at Ai4 over AI risk, jobs, openness and regulation, leaving infrastructure investors to plan capacity amid unsettled deployment rules.SpaceX Asks FCC To Wind Down $4.5bn Rural Broadband SupportTelco & ConnectivityAug 7, 2026SpaceX Asks FCC To Wind Down $4.5bn Rural Broadband SupportLight Reading reported that SpaceX urged the FCC to sunset High-Cost rural broadband subsidies, while rural telecom and electric-cooperative groups said LEO satellite coverage cannot replace terrestrial network support.OpenAI Expands Free ChatGPT Access In GPT-5.6 RolloutAIAug 7, 2026OpenAI Expands Free ChatGPT Access In GPT-5.6 RolloutBleepingComputer reported that OpenAI is rolling out GPT-5.6 Sol for paid ChatGPT users and GPT-5.6 Luna for Free and Go users, pairing unlimited free text chats with a new reasoning control and additional safeguards for users believed to be under 18.JLL Data Centre Report Shows Middle East Pipeline Pause As FLAPD GrowsCapital & PolicyAug 7, 2026JLL Data Centre Report Shows Middle East Pipeline Pause As FLAPD GrowsData Center Dynamics reported that JLL's EMEA Mid-Year Data Centre Report 2026 put FLAPD live capacity at 3.8GW, while the Middle East had 2.6GW in development paused and 13.8GW in planning.AWS Adds Persistent Runtime Instances For Production AI AgentsCloud & Data CentersAug 7, 2026AWS Adds Persistent Runtime Instances For Production AI AgentsAWS announced runtime instances for Amazon Bedrock AgentCore Runtime, adding managed infrastructure for multi-agent workflows, shared sessions lasting up to 14 days and GPU-supported production agent deployments.AI Patch Study Keeps Humans In Vulnerability ReviewsCybersecurityAug 7, 2026AI Patch Study Keeps Humans In Vulnerability ReviewsThe Register reported that 1Password Off-by-1 Labs tested 6,080 AI-generated patches across six CVEs and found clean autonomous fixes in 26.0 percent of cases, leaving security teams with a supervision problem rather than a replacement for vulnerability review.